House Re Pipe in Lincoln Park
Details
Client Alyse M.
Completed March 2022
Timeframe same day service, 2 days labor
Location Lincoln Park
Additional Details
Tied into both hot and cold mains. Rerouted both lines out of slab into attic crawl space. Ran both lines to back-to-back restrooms. Ran lines down dividing wall. Tied into all fixture lines. Pulled range out, and opened drywall behind the range. Stubbed hot and cold lines through walls, running lines through kitchen cabinets. Installed new angle stops and supply lines under the kitchen sink. Strapped all lines as needed. 10-year warranty